Skip to the content

Article · For game studios

Project tracking for game studios

Updated

Project tracking in a game studio tends to break in the same place. The code is in one tool, the art in a shared drive, the sounds in someone's messages, and nobody can say what is going into the next build without asking three people.

Kanbanq puts all of it on one board the whole studio watches change: every discipline, every file on the card it belongs to, and a cycle that ends when the build does.

Project tracking for a studio, one build at a time

1

Put the whole studio on the board

Programmers, artists, designers and the composer, on one live board. Everyone's cursor shows as they work, and the project feed beside the columns keeps questions next to the work, with @ for a person and # for a card.

Free has no limit on people.

Frostlight's board in Kanbanq: To Do, In Progress and Done, with the team's cards and cover art, on the Frostlight sky background.
2

Keep the rest of the game for later

The board holds this build. The feature list, the asset list and every bug not worth fixing yet wait in Tasks for later, sorted by category, until you pull them over.

Kanbanq's Tasks for later beside the board: a column for each category, Design and Audio, with the cards that wait in each.
3

Put the files on the card

The screenshot, the sound, the model and the design note go on the card they belong to. Nobody digs through a drive for the latest version.

Free holds 10 files of up to 5 MB. Pro has no count and takes files up to 100 MB.

A Kanbanq card open: Bridge collision snag, its note, a checklist, a screenshot, and under it a sound, a 3D model and a document, each on a row of its own.
4

Hand cards to your agents

Claude Code, Cursor and other tools connect through Kanbanq's own MCP server. On Pro an agent joins the studio with its own name, takes the card it is given and reports back in the feed.

On Free your tools read the board. Writing needs Pro, and the first write opens a seven-day trial.

A Kanbanq card open beside the project feed: Laura asks Stoker, the studio's agent, to rebuild the plank collider, and Stoker, marked Agent, replies that he has rebuilt it and ticked two of the three checks, and hands it back to her for the retest.
5

Ship the build, close the cycle

Press Complete on Done. Its cards are archived, the next cycle opens, and everyone gets an email of what shipped. A written summary covers code, art and audio, a category at a time.

A completed cycle in Kanbanq: First playable and its summary, with a write-up for each category under it.

Free for the whole studio

€0

for any number of people, with no time limit

250

active tasks on Free

3D

models in glTF, FBX or OBJ, turned on the card

Pro, at €9 a month for up to ten people, has no limit on tasks or files and adds agents at no extra charge.

Art and audio, opened on the card

A card is where the work is, so its files open there. A model turns, with its wireframe and the light to change. A sound plays with its waveform. A clip runs, and Markdown, code and spreadsheets read as pages. The artist checks the blockout and the programmer hears the footstep without leaving the board.

Kanbanq's preview window showing a 3D model from the card, a blockout of a sled, with controls to turn, move, zoom, see its wireframe and change the light.
A sled blockout, turned on the card.
Kanbanq's preview window playing a sound file from the card: its waveform with a playhead three seconds in, Play, loop and volume.
The sound on the same card, played where it is filed.

A cycle ends when the build is done, not when the calendar says so.

Every discipline, one way of working

  • Bugs

    A Bug Fix category in Tasks for later, priority for severity, and onto the board when someone fixes them.

  • Builds

    One cycle a build. Close it when the build ships, and the summary says what changed.

  • Levels

    Layout, feedback and sign-off on the same board as the engineering they wait on.

  • Art and audio

    Each asset a card with one owner, its file attached and its state in plain sight.

  • QA

    A QA column between In Progress and Done, and every bug's state on the board.

  • Launch

    Store page, press kit, trailer and review keys in one launch cycle, so you know what is left.

Kanbanq has no milestones or task dependencies today, so a studio that plans by them will keep those elsewhere for now. Milestones and due dates are coming soon.

Your game's art behind the board

Pick one of Kanbanq's own backgrounds, or upload a frame from the game itself, and the studio opens its own world every morning. Then publish the board read only: anyone with its address can follow the build without an account, and finished cards leave it when their cycle closes.

Frostlight's board in Kanbanq: To Do, In Progress and Done, with the team's cards and cover art, on a background of the game's old bridge.
Frostlight's board, on a picture of the game's own bridge.

Questions from game studios

Planning the game

How do cycles work for game development?

A cycle is a batch of work, like a sprint without an enforced end date. You close it when the build is done, which suits a game: builds rarely ship on a fixed fortnight. The board counts the days it has been open, and nothing counts down.

How does milestone planning work in Kanbanq?

Not yet: milestones and due dates are coming soon. Until then, keep everything planned but not under way in Tasks for later, sorted by category, and name each cycle after the milestone it delivers: Vertical slice, First playable, Demo. When you start one, pull its cards onto the board.

Can I track bugs and features on the same board?

Yes. Give bugs a category of their own, use each card's priority for severity, and keep them in the same cycle as the features so nothing slips. Or triage them in Tasks for later first and bring over only the ones you will fix now.

Can I use Kanbanq for a project that runs for years?

Yes. Tasks for later hold the long list without cluttering the board, and every closed cycle keeps what was finished, by category and by person. Over a few years that is a record of the whole production, useful for retrospectives and publisher updates.

The studio

How does Kanbanq compare to Codecks or HacknPlan?

Both are made for game development and hold more of production planning. Kanbanq keeps to one live board for every discipline, free for the whole team. The comparisons set it out side by side: HacknPlan and Codecks.

What can our coding agents do on the board?

Read it on every plan: the cards, the columns, the cycle. On Pro they also write, so an agent can take a card, update it and report back in the project feed. On Free the first write opens a seven-day trial.

Is Kanbanq good for solo developers as well as studios?

Yes. The board is the same for one person as for thirty, there is nothing to configure, and Free costs nothing. Tasks for later are where ideas wait without being lost.

How does pricing work?

Free has no limit on people and holds 250 active tasks. Pro is €9 a month for a team of up to ten, with no limit on tasks or files and agents at no extra charge. Every plan is on the pricing page.

Keep reading

Focus on the game. Not on the tool.

Free for the whole team. No card needed.Start a board, free